Ratana-5 Well Drilling

Ratana-5 Well Drilling

Ratana-5 Well – Ratana-5 development well will be the fifth well drilled on the Ratana structure in the onshore Ratana D&PL lease and has an objective of providing significant sustainable production in the field from all the Paleogene fractured carbonate reservoirs, the clastic Datta Formation and fractured carbonates of the Wargal Formation. The SLDC 2000 HP Rig-223 has deployed to drill Ratana-5 well. The well planned TD criteria is to drill around ±14m into the Amb formation at ±5675m MDRT/±5665m TVDRT (-5244m TVDSS) and well will be spud in 1st week of June 2021.
Posted in Operations.